The actual requirement
The certifier did not ask for a general underground-services scan.
The information request required a pipe survey and accurate diagram showing the dwelling's proximity to both the sewer main and the house connection branch. The evidence was needed to assess whether the existing building affected the infrastructure and whether a separate asset-owner approval was required.
A report can contain useful locating information but still leave an RFI unanswered if one required branch, connection point or relationship to the building is not verified.
